4/19 Project Update

What we did today:

As a group, we all worked on setting everything up so that once all of the functionality is built in we can begin testing. This includes the actual construction and implementation of the features on the helmet as well as the digital side of logging and posting updates.

ben:

Working on installing the GPS system inside of the helmet so that we can have that ready for Ibrahim to test the functionality.

brandon:

Coordinated the team as well as wrote the Blackboard post for both last class and this class.

connor:

Continued development and updating of the website to keep constant and accurate updates coming.

ibrahim:

Helped ben try to work out how to get the GPS system to work within the helmet so we can then move into the testing stage.